|
About the Feature Requests category
|
|
1
|
515
|
September 3, 2020
|
|
S2400 MIDI sequencer capabilities
|
|
0
|
14
|
July 12, 2026
|
|
Act as banks (DSP) as an option instead of default
|
|
2
|
74
|
July 10, 2026
|
|
"Legato pattern switch" - playhead continues from same place
|
|
0
|
20
|
June 30, 2026
|
|
Midi clock out when sampling
|
|
0
|
37
|
June 23, 2026
|
|
Dsp firmware wishlist
|
|
5
|
113
|
June 18, 2026
|
|
End of Cycle Trigger
|
|
0
|
40
|
June 18, 2026
|
|
DSP : LFO on parameters
|
|
6
|
202
|
June 12, 2026
|
|
Multi-track Re-sampling
|
|
0
|
59
|
June 11, 2026
|
|
Loop : make them infinite and available for files >2MB
|
|
7
|
484
|
June 12, 2026
|
|
Back + Pad in pitch multimode uses defined scale
|
|
0
|
34
|
June 9, 2026
|
|
Extending the length of the looped measure
|
|
3
|
80
|
May 25, 2026
|
|
Live Loops
|
|
0
|
43
|
May 23, 2026
|
|
Visual feedback
|
|
5
|
169
|
April 21, 2026
|
|
Midi-Sequencer Ability to Record Pitch-Bend, Modulation Wheel, Standard CCs
|
|
22
|
1434
|
April 19, 2026
|
|
MIDI CCs for Pitch
|
|
18
|
970
|
April 12, 2026
|
|
Pitch bend for MIDI sequencing
|
|
22
|
867
|
March 8, 2026
|
|
Multi out template to avoid setting outs every sample change
|
|
2
|
73
|
March 5, 2026
|
|
Input Monitoring default
|
|
2
|
86
|
February 18, 2026
|
|
Quality of Life Improvements: Workflow, DSP & Audio Routing
|
|
10
|
432
|
February 10, 2026
|
|
Bank + Pad = Live FX
|
|
1
|
59
|
February 10, 2026
|
|
Live loop longer than pattern length?
|
|
5
|
112
|
January 13, 2026
|
|
My dream : Track settings with Output and Transpose directly on screen
|
|
0
|
69
|
January 13, 2026
|
|
Legato and Portamento implementation somewhere [SOLUTION-ish]
|
|
1
|
92
|
January 12, 2026
|
|
Microtiming in tr-mode
|
|
7
|
324
|
January 2, 2026
|
|
Quantize after recording unquantized (fine)
|
|
38
|
1676
|
December 26, 2025
|
|
Copy/Paste section functionality in Song Mode
|
|
3
|
99
|
November 19, 2025
|
|
Ping-pong loop
|
|
75
|
3008
|
November 9, 2025
|
|
Auto clear of DSP config upon different loading a different project
|
|
2
|
100
|
November 9, 2025
|
|
Load project starts at last project selected
|
|
1
|
56
|
November 6, 2025
|